Shaw Campus – Renovation Works for History Gallery (Levels 2 and 3 of David C. Lam Building) and Connection of BU Bridge (Levels 4 and 5 of Shaw Tower)
逸夫校園 – 校史展覽廳﹝思齊樓二樓及三樓﹞及浸大橋與逸夫行政樓連接處﹝逸夫行政樓四樓及五樓﹞翻新工程

2026-03-27
 

Date

:

From 1 April 2026 (Wednesday) to 31 August 2026 (Monday) 

Time

:

8 a.m. – 6 p.m. (Night work may be arranged if necessary)

Affected Area

:

1. History Gallery (Levels 1 to 3 of The Wing Lung Bank Building of Business Studies (WLB) and David C. Lam Building);
2. Connection of BU Bridge (Levels 3 to 5 of Shaw Tower)
For details of the affected areas, please click here.

Enquiry

:

Security Hotline (ext. 7777), Ms. Ashley Yeung (ext. 2133), Ms. Rachel Wong (ext. 5603), Mr. Frank Lau (ext. 5626) or Mr. Andrew Law (ext. 2238)

Remarks

:

1.

Notice to Pedestrians Please use the street-level crossings at Renfrew Road and Junction Road to travel between Shaw Campus and Ho Sin Hang Campus. From 1 to 26 April 2026, please use the escalator/elevator on Level 3 of the Li Promenade to access the Andrew Hung Lecture Theatr (WLB210) or Simon Yim Lecture Theatre (WLB211) on Level 2 of WLB.

  

2.

Construction noise, vibration and dust will be induced by the site works occasionally. 

  

3.

Works area will be fenced off.

  

4.

Please keep away from the works area.  

  

5.

Please follow the notice on site.

    

 

 

日期

:

由二零二六年四月一日﹝星期三﹞
至二零二六年八月三十一日﹝星期一﹞

  

時間

:

上午八時至下午六時﹝如有需要,或會安排夜間施工﹞

  

受影響範圍

:

1 . 校史展覽廳 ﹝思齊樓及永隆銀行商學大樓一樓至三樓﹞;
2.  浸大橋與逸夫行政樓連接處 ﹝逸夫行政樓三樓至五樓﹞
請按此處查看受影響範圍。  

   

查詢

:

校園保安熱線﹝內線 7777﹞、 楊潔心女士﹝內線 2133﹞、黃彥彤女士﹝內線 5603﹞、劉永昌先生﹝內線 5626﹞或 羅峻耀先生﹝內線 2238﹞  

   

備註

:

1.

行人注意 — 請使用位於聯福道及聯合道的地面行人過路設施往返逸夫校園及善衡校園;另外,於二零二六年四月一日至二十六日期間,請使用李作權大道三樓的扶手電梯或電梯,前往永隆銀行商學大樓二樓的洪瑞德演講廳(WLB210) 或 閻小穎演講廳(WLB211)。 

   
  

2.

工程將會間歇產生噪音ヽ震盪及塵埃。 

   
  

3.

工程範圍將會被圍封。

   
  

4.

請遠離工程範圍。

   
  

5.

請留意現場告示。