Shaw Campus – Renovation Works at Level 4 of The Wing Lung Bank Building for Business Studies (WLB)
逸夫校園 – 永隆銀行商學大樓四樓裝修工程  

2026-10-27

 

Date

:

From 31 October 2026 (Saturday) to 31 December 2026 (Thursday) 

Affected Area

:

 Counselling and Development Section, Office of Student Affairs, Room WLB403, Level 4, WLB
For details of the affected area, please click here.

Enquiry

:

Security Hotline (ext. 7777), Ms. Ashley Yeung (ext. 2133) or Ms. Yo Yo Yiu (ext. 2498)

Remarks

:

1.

Areas with construction works will be fenced off, and part of affected area will be closed temporarily.

  

2.

Please keep away from the works areas.

  

3.

Nuisances from construction, vibration and dust will be induced intermittently.

  

4.

Please pay attention to the notices posted on site.

  

5.

During the construction period, the General Office of the Office of Student Affairs will remain open as usual from Monday to Friday.

 

日期

:

由二零二六年十月三十一日﹝星期六﹞
至二零二六年十二月三十一日﹝星期四﹞

 

受影響範圍

:

永隆銀行商學大樓四樓WLB403 室,學生事務處輔導組
請按此處查看受影響範圍。

 

查詢

:

校園保安熱線﹝內線 7777﹞、楊潔心女士﹝內線 2133﹞或 姚佩珊女士﹝內線 2498﹞

  

備註

:

1.

工程範圍將被圍封,部分受影響區域將暫時封閉。

  
  

2.

請遠離工程範圍。

  
  

3.

工程將會帶來間歇性滋擾。

  
  

4.

請留意現場告示。

  
  

5.

工程期間,學生事務處總辦事處將維持正常辦公時間,星期一至星期五照常辦公。