Baptist University Road Campus – Dismantling of Scaffolding at the External Facades of Madam Chan Wu Wan Kwai School of Continuing Education Tower
浸會大學道校園 – 陳瑞槐夫人胡尹桂女士持續教育大樓外牆棚架拆卸工程  

2026-08-28

 

Date

:

From 29 August 2026 (Saturday) to 27 September 2026 (Sunday) 

Affected Area

:

Madam Chan Wu Wan Kwai School of Continuing Education Tower
For details of the affected area, please click here.

Enquiry

:

Security Hotline (ext. 7777), Ms. Ann Law (ext. 5736) or Mr. Sam Cheng (ext. 5625)

Remarks

:

1.

Scaffolding to the external façade of the building will be dismantled in phases.

  

2.

Areas with construction work will be fenced off, and part of affected area will be closed temporarily. 

  

3.

Please keep away from the works areas.

  

4.

Nuisances from construction will be induced intermittently.

  

5.

Please pay attention to the notices posted on site.

 

日期

:

由二零二六年八月二十九日﹝星期六﹞
至二零二六年九月二十七日﹝星期日﹞

 

受影響範圍

:

陳瑞槐夫人胡尹桂女士持續教育大樓
請按此處查看受影響範圍。

 

查詢

:

校園保安熱線﹝內線 7777﹞、羅靜銘女士﹝內線 5736﹞或 鄭浩旻先生﹝內線 5625﹞ 

  

備註

:

1.

大廈外牆棚架將會分階段拆卸。 

  
  

2.

工程範圍將被圍封,部分受影響區域將暫時封閉。

  
  

3.

請遠離工程範圍。

  
  

4.

工程將會帶來間歇性滋擾。

  
  

5.

請留意現場告示。