2026-08-19
Date | : | From 22 August 2026 (Saturday) to 30 August 2026 (Sunday) | |
Affected Area | : | Ground Floor and Level 2 escalator lobbies at the Wai Hang Sports Centre entrance | |
Enquiry | : | Security Hotline (ext. 7777), Mr. Steven Chan (ext. 2070) or Mr. Tsang (ext. 7993) | |
Remarks | : | 1. | During the works period, please use the zebra crossing or the lift/ramp besides the chapel to access Shaw Campus and Baptist University Road Campus. |
2. | Areas with construction works will be fenced off, and part of the affected area will be temporarily closed. | ||
3. | Please keep away from the works areas. | ||
4. | Nuisances from construction will be induced intermittently. | ||
5. | Please pay attention to the notices posted on site. | ||
日期 | : | 由二零二六年八月二十二日﹝星期六﹞ | |||
受影響範圍 | : | 偉衡體育中心地下及二樓扶手電梯大堂 | |||
查詢 | : | 校園保安熱線﹝內線 7777﹞、陳子麟先生〔內線 2070〕或 曾智鋒先生﹝內線 7993﹞ | |||
備註 | : | 1. | 工程進行期間,請使用斑馬線或教堂旁的電梯/坡道,經浸大橋前往逸夫校園及浸會大學道校園。 | ||
2. | 工程範圍將被圍封,部分受影響區域將暫時封閉。 | ||||
3. | 請遠離工程範圍。 | ||||
4. | 工程將會帶來間歇性滋擾。 | ||||
5. | 請留意現場告示。 | ||||