Shaw Campus – Renovation Works for History Gallery (Levels 2 and 3 of David C. Lam Building) and Connection of BU Bridge (Levels 4 and 5 of Shaw Tower)
逸夫校園 – 校史展覽廳﹝思齊樓二樓及三樓﹞及浸大橋與逸夫行政樓連接處﹝逸夫行政樓四樓及五樓﹞翻新工程

2026-05-26
 

Date

:

From 30 May 2026 (Saturday) to 7 June 2026 (Sunday)

Time

:

9 a.m. - 4 p.m. (Night work may be arranged if necessary)

Affected Area

:

Li Promenade
For details of the affected areas, please click here.

Enquiry

:

Security Hotline (ext. 7777), Ms. Rachel Wong (ext. 5603), Mr. Frank Lau (ext. 5626) or Mr. Andrew Law (ext. 2238)

Remarks

:

1.

Areas with construction work will be fenced off.

  

2.

Please keep away from the works area.

  

3.

Nuisances from construction will be induced intermittently.  

  

4.

Please pay attention to the notices posted on site.

 

日期

:

由二零二六年五月三十日﹝星期六﹞
至二零二六年六月七日﹝星期日﹞

 

工作時間

:

上午九時至下午四時﹝如有需要,或會安排夜間施工﹞

 

受影響範圍_____

:

李作權大道
請按此處查看受影響範圍。

  

查詢

:

校園保安熱線﹝內線 7777﹞、黃彥彤女士﹝內線 5603﹞、劉永昌先生﹝內線 5626﹞或 羅峻耀先生﹝內線 2238﹞

  

備註

:

1.

工程範圍會被封閉。 

  
  

2.

請遠離工程範圍。

  
  

3.

工程將會帶來間歇性滋擾。

  
  

4.

請留意現場告示安排。