Shaw Campus – Replacement and Repair Work of Deboned External Wall Tiles at Levels 1 to 3 of David C. Lam Building and The Wing Lung Bank Building for Business Studies   
逸夫校園 – 思齊樓與永隆銀行商學大樓一至三樓外牆磚瓦更換工程

2026-03-25
 

Date

:

From 26 March 2026 (Thursday) to 30 April 2026 (Thursday) 

Affected Area

:

Main entrance at Level 1 and external wall from Levels 1 to 3 of David C. Lam Building and The Wing Lung Bank Building for Business Studies
For details of the affected area, please click here.

Enquiry

:

Security Hotline (ext. 7777), Miss Meris Sin (ext. 2490), Ms. Ashley Yeung (ext. 2133) or Mr. Tsang (ext. 7993)

Remarks

:

1.

Areas with construction works will be fenced off.  

  

2.

Please keep away from the areas with construction works.  

  

3.

Nuisances from construction will be induced intermittently.

  

4.

Please pay attention to the notices posted on site.  

    

 

日期

:

由二零二六年三月二十六日﹝星期四〕
至二零二六年四月三十日﹝星期四﹞

  

受影響範圍

:

思齊樓與永隆銀行商學大樓一樓主要出入口及一至三樓外牆 
請按此處受影響範圍。  

   

查詢

:

校園保安熱線〔內線 7777〕、冼亦婷小姐﹝內線 2490﹞、楊潔心女士﹝內線 2133﹞或 曾智鋒先生﹝內線 7993﹞  

   

備註

:

1.

工程期間,施工範圍會封閉。 

   
  

2.

請遠離工程範圍。 

   
  

3.

工程將會帶來間歇性滋擾。

   
  

4.

請留意現場告示安排。