2026-03-25
Date | : | From 26 March 2026 (Thursday) to 30 April 2026 (Thursday) | |
Affected Area | : | Main entrance at Level 1 and external wall from Levels 1 to 3 of David C. Lam Building and The Wing Lung Bank Building for Business Studies | |
Enquiry | : | Security Hotline (ext. 7777), Miss Meris Sin (ext. 2490), Ms. Ashley Yeung (ext. 2133) or Mr. Tsang (ext. 7993) | |
Remarks | : | 1. | Areas with construction works will be fenced off. |
2. | Please keep away from the areas with construction works. | ||
3. | Nuisances from construction will be induced intermittently. | ||
4. | Please pay attention to the notices posted on site. | ||
日期 | : | 由二零二六年三月二十六日﹝星期四〕 | ||||
受影響範圍 | : | 思齊樓與永隆銀行商學大樓一樓主要出入口及一至三樓外牆 | ||||
查詢 | : | 校園保安熱線〔內線 7777〕、冼亦婷小姐﹝內線 2490﹞、楊潔心女士﹝內線 2133﹞或 曾智鋒先生﹝內線 7993﹞ | ||||
備註 | : | 1. | 工程期間,施工範圍會封閉。 | |||
2. | 請遠離工程範圍。 | |||||
3. | 工程將會帶來間歇性滋擾。 | |||||
4. | 請留意現場告示安排。 | |||||