Baptist University Road Campus – Suspension of Power Supply at Lee Shau Kee Communication and Visual Arts Building     
浸會大學道校園 – 暫停李兆基傳理視藝樓電力供應 

2025-12-24
 

Date

:

Suspension of Normal Power Supply: 5 January 2026 (Monday)
Suspension of Emergency Power Supply: 8 January 2026 (Thursday) 

Time

:

11 p.m. – 5 a.m. (the next day)  

Affected Area

:

Lee Shau Kee Communication and Visual Arts Building

Reason

:

Subject to statutory regulations, Periodic Inspection, Testing and Certification (PITC) of fixed electrical installations shall be conducted once every five years.   

Enquiry

:

Security Hotline (ext. 7777)

 

日期

:

暫停一般電力供應:二零二六年一月五日〔星期一〕
暫停緊急電力供應:二零二六年一月八日〔星期四〕 

 

時間

:

晚上十一時至翌日上午五時

 

受影響範圍

:

李兆基傳理視藝樓

 

原因 

:

根據法例要求,為固定電力裝置進行每五年一次的定期檢查、測試及領取證明書。

  

查詢

:

校園保安熱線〔內線 7777〕