Shaw Campus – Temporary Closure of Driveway outside the Entrance to Lam Woo International Conference Centre and Part of the Passageway at David C. Lam Building (DLB)
逸夫校園 – 臨時封閉林護國際會議中心外的行車路及思齊樓對出部分行人路

2025-10-06
 

Date

:

8 October 2025 (Wednesday) 

Affected Area

:

Driveway outside the entrance to Lam Woo International Conference Centre and part of the passageway at DLB
For details of the affected area, please click here.

Reason

:

Renovation works to Polyomics Laboratory at DLB110

Enquiry

:

Security Hotline (ext. 77777), Miss Meris Sin (ext. 2490) or Miss Yannie Lam (ext. 7982) 

Remarks

:

1.

Construction noise, vibration and dust will be induced by the site works occasionally.

  

2.

Works area will be fenced off and part of affected area will be temporarily closed.  

  

3.

Please pay attention to the notices posted on site.   

  

4.

Please use the ramp and side entrance of The Wing Lung Bank Building for Business Studies (WLB) at Renfrew Road to enter the WLB and/or Lam Woo International Conference Centre.   

  

5.

Please utilize the pedestrian path on the other side of Renfrew Road.

  

6.

Please note that loading and unloading of goods, as well as passenger pick-up and drop-off, are prohibited in the driveway outside the entrance to Lam Woo International Conference Centre. 

 

日期

:

二零二五年十月八日﹝星期三﹞

 

受影響範圍_____

:

林護國際會議中心外的行車路及思齊樓對出部分行人路
請按此處查看受影響範圍。

  

原因

:

思齊樓一樓DLB110 室裝修工程

  

查詢

:

校園保安熱線﹝內線 7777﹞、冼亦婷小姐﹝內線 2490〕或 林巧茵小姐﹝內線 7982〕

  

備註

:

1.

工程將會間歇產生噪音ヽ震盪及塵埃。

  
  

2.

工程範圍將被圍封。部分受影響範圍將會被暫時封閉。

  
  

3.

請留意現場告示。

  
  

4.

請使用位於聯福道的斜台和側門進入永隆銀行商學大樓和/或林護國際會議中心。 

  
  

5.

請盡量使用聯福道另一側的行人路。

  
  

6.

林護國際會議中心外車路禁止進行裝卸貨及上落客。