Shaw Campus – Suspension of Air Conditioning Supply at The Wing Lung Bank Building for Business Studies (WLB)   
逸夫校園 – 暫停永隆銀行商學大樓冷氣供應

2025-07-22
 

Date

:

From 26 July 2025 (Saturday), 3:30 p.m. to 27 July 2025 (Sunday), 6 p.m.  

Affected Area

:

WLB301A, Career Centre
WLB301, iCafe Activities
Room WLB302, iCafe
Security Control Center
For details of the affected area, please click here.

Reason

:

Replacement of chilled water pipe on Level 2 of WLB   

Enquiry

:

Security Hotline (ext. 77777), Ms. Ashley Yeung (ext. 2133) or Mr. Wing Lau (ext. 7983)   

Remarks

:

1.

Areas with construction works will be fenced off. 

  

2.

Please keep away from the areas with construction works.   

  

3.

Nuisances from construction will be induced intermittently.  

  

4.

Please pay attention to the notices posted on site. 

 

日期

:

由二零二五年七月二十六日﹝星期六﹞下午三時三十分
至二零二五年七月二十七日﹝星期日﹞下午六時

 

受影響範圍_____

:

事業策劃中心 WLB301A 室
iCafe 活動室 WLB301 室
iCafe WLB302 室
保安控制中心 
請按此處查看受影響範圍。

  

原因 

:

永隆銀行商學大樓二樓冷水喉更換工程

  

查詢

:

校園保安熱線〔內線 77777〕、楊潔心女士〔內線 2133〕或 劉官荣先生〔內線 7983〕

  

備註

:

1.

工程範圍將會被圍封。 

  
  

2.

請遠離工程範圍。

  

 

 

3.

工程將會帶來間歇性滋擾。  

  
  

4.

請留意現場告示。