Date

:

From 25 July 2025 (Friday) to 30 April 2026 (Thursday)  

Affected Area

:

South Tower and Connection Block of SRH
For details of the affected area, please click here.

Enquiry

:

Security Hotline (ext. 7777), Miss Yannie Lam (ext. 7982) or Ms. Kiki Hui (Tel no.: 9350 0011, Contractor representative for enquiry on Safety Enhancement and Repair Works at SRH project)   

Remarks

:

1.

The external wall scaffolding will be retained. 

  

2.

Work areas will be fenced off and part of the affected area will be temporarily closed.   

  

3.

Construction noise, vibration and dust will be induced by the site works. 

  

4.

Please keep away from the areas with construction works.    

  

5.

The BU Fiesta will remain open as usual during the construction period.   

  

6.

Please pay attention to the notices posted on site. 

 

日期

:

由二零二五年七月二十五日〔星期五〕
至二零二六年四月三十日〔星期四〕

 

受影響範圍_____

:

學生宿舍南座及連接座 
請按此處查看受影響範圍。

  

查詢

:

校園保安熱線〔內線 77777〕ヽ 林巧茵小姐〔內線 7982〕 或 許康祺女士〔電話: 9350 0011, 承建商代表, 負責學生宿舍外牆翻新工程問題咨詢〕

  

備註

:

1.

外牆棚架會被保留。 

  
  

2.

工程範圍將會被圍封及部分受影響範圍會被臨時關閉。

  

 

 

3.

工程期間將會間歇性產生噪音、震盪及塵埃。  

  
  

4.

請遠離工程範圍。 

  
  

5.

請 學生宿舍餐廳於工程期間將會照常營業。 

  
  

6.

請留意現場告示。