2024-01-25
Date and Time | : | From 27 January 2024 (Saturday), 9 a.m. | |
Affected Area | : | Lift lobby on G/F, Student Residence Halls (SRH) (South Tower) | |
Reason | : | Cable threading works above false ceiling | |
Enquiry | : | Security Hotline (ext. 7777) or Mr. Matthew Suen (ext. 5625) | |
Remarks | : | 1. | Areas with construction works will be fenced off. |
2. | Please keep away from the areas with construction works. | ||
|
| 3. | Nuisances from construction will be induced intermittently. |
4. | Please pay attention to the notices posted on site. |
日期及時間 | : | 由二零二四年一月二十七日〔星期六〕早上九時 | |
受影響範圍_____ | : | 學生宿舍〔南座〕地下電梯大堂 | |
原因 | : | 假天花頂穿線工程 | |
查詢 | : | 校園保安熱線〔內線 7777〕 或 孫日衡先生〔內線 5625〕 | |
備註 | : | 1. | 工程範圍將會被圍封。 |
2. | 請遠離工程範圍。 | ||
|
| 3. | 工程將會帶來間歇性滋擾。 |
4. | 請留意現場告示。 |